Log in
Enquire now
‌

TRIPLE RING TECHNOLOGIES INC STTR Phase II Award, September 2021

A STTR Phase II contract was awarded to Triple Ring Technologies in September, 2021 for $1,490,551.0 USD from the U.S. Department of Defense and DARPA.

OverviewStructured DataIssuesContributors

Contents

sbir.gov/node/2347451
Is a
SBIR/STTR Awards
SBIR/STTR Awards

SBIR/STTR Award attributes

SBIR/STTR Award Recipient
Triple Ring Technologies
Triple Ring Technologies
0
Government Agency
U.S. Department of Defense
U.S. Department of Defense
0
Government Branch
DARPA
DARPA
0
Award Type
STTR0
Contract Number (US Government)
FA8750-22-C-05100
Award Phase
Phase II0
Award Amount (USD)
1,490,5510
Date Awarded
September 8, 2021
0
End Date
March 21, 2025
0
Abstract

The concern identified in the DARPA Impact of Cockpit Electro-Magnetics on Aircrew Neurology (ICEMAN) STTR Opportunity Announcement is that strong electromagnetic fields (EMF) within modern Department of Defense (DoD) aircraft cockpits may be degrading pilot performance and potentially leading to mishaps including loss of life.  Proposers received funding for a Phase 1 effort responding to the announcement.  A major part of our Phase I effort was to attempt to inform the design of  instrumentation to enable the electromagnetic characterization of modern civilian aircraft with electronic cockpit instrumentation.  Proposers also designed a Basic Personal Electromagnetic Monitor (BPEM), and have submitted a draft IRB for a research study plan which could be used in Phase II involving human subjects.  We now proposed a Phase 2 effort consisting of the a Base plan for one year of work and Options 1 and 2 of one year each. The Base plan for work in Year 1 consists of: Month 1: Kickoff meeting and finalize Phase II Work Plan based on PM feedback Month 6: Finalize  in-flight  PEM (FPEM) hardware and experimental design, submit IRB protocol Month 9: Complete Phase II EM/RF sensor suite development and conduct EM/RF measurement data collection in representative aircraft on ground, in flight and during flight maneuvers For the work in Option 1, to be done in Year 2 the proposers would: Month 13: Complete Phase II EMF generator development and begin lab-based (non-human subject research or non-HSR) testing. Month 17: Begin HSR experimentation in laboratory and ground-based cockpit settings Month 21: Provide initial experimental findings and recommendations for potential mitigation strategies Month 24: Provide demonstration and results of non-HSR mitigation strategy experimentation For the work in Option 2, to be done in Year 3 proposers would: Month 36: Provide Demonstration and Results Of HSR Mitigation Strategy Experimentation The deliverables for this program would include reports summarizing: 1) EM/RF sensing prototype technical specifications and functionality testing results 2) Cockpit EM/RF measurement experimentation methods, results and interpretation 3) EM/RF generation prototype technical specifications and functionality testing results 4) HSR and non-HSR experimentation protocols and results

Timeline

No Timeline data yet.

Further Resources

Title
Author
Link
Type
Date
No Further Resources data yet.

References

Find more entities like TRIPLE RING TECHNOLOGIES INC STTR Phase II Award, September 2021

Use the Golden Query Tool to find similar entities by any field in the Knowledge Graph, including industry, location, and more.
Open Query Tool
Access by API
Golden Query Tool
Golden logo

Company

  • Home
  • Press & Media
  • Blog
  • Careers
  • WE'RE HIRING

Products

  • Knowledge Graph
  • Query Tool
  • Data Requests
  • Knowledge Storage
  • API
  • Pricing
  • Enterprise
  • ChatGPT Plugin

Legal

  • Terms of Service
  • Enterprise Terms of Service
  • Privacy Policy

Help

  • Help center
  • API Documentation
  • Contact Us
By using this site, you agree to our Terms of Service.