Patent attributes
A method of fracturing a subterranean formation and forming a fracture network therein that includes at least one primary fracture and at least one microfracture is provided. A plurality of micro-proppant particulates is mixed with the fracturing fluid and placed in the microfracture, and a plurality of primary proppant particulates are mixed with the fracturing fluid and placed in the primary fracture. The step of mixing the micro-proppant particulates with the fracturing fluid continues for so long as the primary proppant particulates are mixed with the fracturing fluid and the fracturing fluid and primary proppant particulates are pumped into the formation.