A method for utilizing date sets in a manufacturing system includes receiving an order associated with a manufacturing activity, identifying steps involved in the manufacturing activity, and formulating multiple schedules, where each schedule associates the steps with dates. The method also includes selecting one of the schedules for the manufacturing activity.