Log in
Enquire now
‌

US Patent 11682902 Managing queue distribution between critical datacenter and flexible datacenter

OverviewStructured DataIssuesContributors

Contents

TimelineTable: Further ResourcesReferences
Is a
Patent
Patent
1

Patent attributes

Patent Jurisdiction
United States Patent and Trademark Office
United States Patent and Trademark Office
1
Patent Number
116829021
Date of Patent
June 20, 2023
1
Patent Application Number
177508831
Date Filed
May 23, 2022
1
Patent Citations
‌
US Patent 11016553 Methods and systems for distributed power control of flexible datacenters
1
‌
US Patent 11025060 Providing computational resource availability based on power-generation signals
1
‌
US Patent 11031787 System of critical datacenters and behind-the-meter flexible datacenters
1
‌
US Patent 11031813 Systems and methods for auxiliary power management of behind-the-meter power loads
1
‌
US Patent 11042948 Computing component arrangement based on ramping capabilities
1
‌
US Patent 11256320 Redundant flexible datacenter workload scheduling
1
‌
US Patent 11275427 Methods and systems for distributed power control of flexible datacenters
1
‌
US Patent 11397999 Modifying computing system operations based on cost and power conditions
1
...
Patent Citations Received
‌
US Patent 12089546 Method and system for dynamic power delivery to a flexible growcenter using unutilized energy sources
2
‌
US Patent 11961151 Modifying computing system operations based on cost and power conditions
3
‌
US Patent 12067633 Computing component arrangement based on ramping capabilities
4
‌
US Patent 12021385 Methods and systems for adjusting power consumption based on a fixed-duration power option agreement
5
‌
US Patent 12065048 Behind-the-meter charging station with availability notification
6
‌
US Patent 11949232 System of critical datacenters and behind-the-meter flexible datacenters
7
Patent Primary Examiner
‌
Ranodhi Serrao
1

Systems include one or more critical datacenter connected to behind-the-meter flexible datacenters. The critical datacenter is powered by grid power and not necessarily collocated with the flexible datacenters, which are powered “behind the meter.” When a computational operation to be performed at the critical datacenter is identified and determined that it can be performed more efficiently or advantageously at a flexible datacenter, the computational operation is instead obtained by the flexible datacenters for performance The critical datacenter and flexible datacenters preferably share a dedicated communication pathway to enable high-bandwidth, low-latency, secure data transmissions. A queue system may be used to organize computational operations waiting for distribution to either the critical datacenter or the flexible datacenter.

Timeline

No Timeline data yet.

Further Resources

Title
Author
Link
Type
Date
No Further Resources data yet.

References

Find more entities like US Patent 11682902 Managing queue distribution between critical datacenter and flexible datacenter

Use the Golden Query Tool to find similar entities by any field in the Knowledge Graph, including industry, location, and more.
Open Query Tool
Access by API
Golden Query Tool
Golden logo

Company

  • Home
  • Press & Media
  • Blog
  • Careers
  • WE'RE HIRING

Products

  • Knowledge Graph
  • Query Tool
  • Data Requests
  • Knowledge Storage
  • API
  • Pricing
  • Enterprise
  • ChatGPT Plugin

Legal

  • Terms of Service
  • Enterprise Terms of Service
  • Privacy Policy

Help

  • Help center
  • API Documentation
  • Contact Us
By using this site, you agree to our Terms of Service.