A building construction method uses wall frames having a moveable top track. The track is fixed in a raised position so as to be load-bearing during construction, allowing construction work to progress quickly. When supporting concrete columns have cured, the fixing can be released allowing the track to move into a lowered position and for the building load to transfer to the columns.