Is a
Patent attributes
Patent Applicant
Patent Jurisdiction
Patent Number
Date of Patent
January 7, 2020
Patent Application Number
15974499
Date Filed
May 8, 2018
Patent Citations
Patent Primary Examiner
Patent abstract
Systems and methods for managing nodes in mesh networks are provided. A critical node may determine a status of a backhaul connection prior to joining a PAN. A critical path may be created and maintained that includes the critical node and any intervening nodes between the critical node and the root. A critical node may switch PANs when a backhaul connection becomes unavailable. The switch may be facilitated by a node on the critical path other than the critical node. A node may switch PANs and coordinate the switch with its child nodes.
Timeline
No Timeline data yet.
Further Resources
No Further Resources data yet.