Log in
Enquire now
‌

TIBARAY, INC. SBIR Phase I Award, June 2021

A SBIR Phase I contract was awarded to TIBARAY, INC. in June, 2021 for $199,967.0 USD from the U.S. Department of Energy.

OverviewStructured DataIssuesContributors

Contents

sbir.gov/node/2073761
Is a
SBIR/STTR Awards
SBIR/STTR Awards

SBIR/STTR Award attributes

SBIR/STTR Award Recipient
TIBARAY, INC.
TIBARAY, INC.
0
Government Agency
U.S. Department of Energy
U.S. Department of Energy
0
Award Type
SBIR0
Contract Number (US Government)
DE-SC00219260
Award Phase
Phase I0
Award Amount (USD)
199,9670
Date Awarded
June 28, 2021
0
End Date
March 27, 2022
0
Abstract

The limited evolution of RF source technology since its inception and the dependence on high voltage components for generating high power, has kept the price and size of these devices very high. The use of magnetrons to overcome these issues introduces non-linearity, poor frequency stability, inability to control phase, and a very low Mean Time Between Failure (MTBF) rate. A radically different approach that optimizes all aspects of the RF sources is therefore required. The goal of building an economic, compact yet high-power RF source, can be achieved through massive integration of highly efficient small klystron sources. These can leverage novel, cost-effective modulators, with fast rise and fall times and built with off-the-shelf electronic components. We propose such a klystron design for achieving the $2/kW goal. Our company, TibaRay Inc. is actively developing a RF component including RF sources for use in our novel medical accelerator application. These are based on recent technology developed at SLAC that involve new approaches to designing highly efficient resonant cavities and for manufacturing them. The proposed RF source will be designed to achieve 70% efficiency while maintaining a compact form factor and light weight. It will operate at X-band frequencies that area a standard for medical and industrial applications as well as for large research accelerators. In Phase I we plan to optimize every design aspect of the klystron (beam voltage, current, cathode diameter, etc). We will also simulate and study the electromagnetic, RF-beam and thermal behavior of the device. Emphasis will be placed on manufacturing ease and reliability. This work will serve as the basis for Phase II where, if approve, we will develop these concepts into commercially available RF sources. We will develop the plan for the production and sale of these devices. Starting from industrial and medical accelerators to large national and international accelerator facilities, there is a significant need for lowering the cost of the RF sources and making them light and compact. Currently, the cost of the high-power RF sources well exceeds the cost of the rest of accelerator facilities. Our proposed solution holds the promise to become a ubiquitous solution for majority of such accelerator systems.

Timeline

No Timeline data yet.

Further Resources

Title
Author
Link
Type
Date
No Further Resources data yet.

References

Find more entities like TIBARAY, INC. SBIR Phase I Award, June 2021

Use the Golden Query Tool to find similar entities by any field in the Knowledge Graph, including industry, location, and more.
Open Query Tool
Access by API
Golden Query Tool
Golden logo

Company

  • Home
  • Press & Media
  • Blog
  • Careers
  • WE'RE HIRING

Products

  • Knowledge Graph
  • Query Tool
  • Data Requests
  • Knowledge Storage
  • API
  • Pricing
  • Enterprise
  • ChatGPT Plugin

Legal

  • Terms of Service
  • Enterprise Terms of Service
  • Privacy Policy

Help

  • Help center
  • API Documentation
  • Contact Us
By using this site, you agree to our Terms of Service.