Log in
Enquire now
‌

Other Lab Inc. SBIR Phase I Award, June 2022

A SBIR Phase I contract was awarded to Other Lab Inc. in June, 2022 for $200,000.0 USD from the U.S. Department of Energy.

OverviewStructured DataIssuesContributors

Contents

sbir.gov/node/2277795
Is a
SBIR/STTR Awards
SBIR/STTR Awards

SBIR/STTR Award attributes

SBIR/STTR Award Recipient
Other Lab Inc.
Other Lab Inc.
0
Government Agency
U.S. Department of Energy
U.S. Department of Energy
0
Award Type
SBIR0
Contract Number (US Government)
DE-SC00226820
Award Phase
Phase I0
Award Amount (USD)
200,0000
Date Awarded
June 27, 2022
0
End Date
June 26, 2023
0
Abstract

Problem Statement: Floating wind has a large potential, with 26GW expected to be deployed worldwide in the next 6-8 years. Unlike fixed offshore wind platforms, floating wind platforms can be disconnected from their mooring and cabling systems and be towed back into port for maintenance and other upgrades. Challenges remain, however, to quickly connect and disconnect mooring lines to the floating wind platform. Ideally, no personnel or temporary equipment should be required to be on the platform during this hook-up process to minimize time offshore, safety risks and costs. Unique Solution: Otherlab has designed a ROV-operated quick-connect mooring connector, which can be placed in line with synthetic rope, wire rope or heavy-duty chain. The connector can be designed to have the same minimum breaking load as 150mm+ (6”) chain. Used in tandem with a commercially-available mooring adjuster, the mooring system can be hooked up without the use of large winches nor personnel onboard the platform. Phase I Activities: In Phase I, Otherlab seeks to design and fabricate a scaled version of the quick connect device. The device will be designed with an ROV-operated hydraulic system in order to achieve the locking strength required. In the laboratory, the hydraulic system will be placed on a dry bench, while the mooring connector can be tested in a submerged environment in realistic conditions. After testing, Otherlab will begin preparations for certification of the device in Phase II. Commercial Applications and Other Benefits: If carried to Phase II or Phase III, this mooring connector has the potential to have a large penetration of the mooring component market, up to 30%. Floating offshore wind developers are seeking solutions to expedite the platform hook-up and disconnect process, whilst reducing risk to offshore personnel. This technology is also well-suited to other marine energy devices, such as wave and tidal devices, which also need to be towed to port for costly maintenance activities. Summary for Members of Congress: Floating wind turbines have a large potential to create manufacturing, operating and maintenance jobs at ports around the country. Currently, the operation to connect and disconnect floating wind turbines to their mooring system is costly, lengthy and cumbersome, requiring machinery and personnel to be transferred to the platform. Otherlab’s solution can reduce installation costs by and hook-up time by up to 50%.

Timeline

No Timeline data yet.

Further Resources

Title
Author
Link
Type
Date
No Further Resources data yet.

References

Find more entities like Other Lab Inc. SBIR Phase I Award, June 2022

Use the Golden Query Tool to find similar entities by any field in the Knowledge Graph, including industry, location, and more.
Open Query Tool
Access by API
Golden Query Tool
Golden logo

Company

  • Home
  • Press & Media
  • Blog
  • Careers
  • WE'RE HIRING

Products

  • Knowledge Graph
  • Query Tool
  • Data Requests
  • Knowledge Storage
  • API
  • Pricing
  • Enterprise
  • ChatGPT Plugin

Legal

  • Terms of Service
  • Enterprise Terms of Service
  • Privacy Policy

Help

  • Help center
  • API Documentation
  • Contact Us
By using this site, you agree to our Terms of Service.