Log in
Enquire now
‌

RadiaSoft LLC SBIR Phase II Award, April 2020

A SBIR Phase II contract was awarded to Radiasoft Llc in April, 2020 for $1,049,670.0 USD from the U.S. Department of Energy.

OverviewStructured DataIssuesContributors

Contents

sbir.gov/node/1712793
Is a
SBIR/STTR Awards
SBIR/STTR Awards

SBIR/STTR Award attributes

SBIR/STTR Award Recipient
‌
Radiasoft Llc
0
Government Agency
U.S. Department of Energy
U.S. Department of Energy
0
Award Type
SBIR0
Contract Number (US Government)
DE-SC00196820
Award Phase
Phase II0
Award Amount (USD)
1,049,6700
Date Awarded
April 6, 2020
0
End Date
April 5, 2022
0
Abstract

Modern particle accelerator facilities generate large amounts of data and face increasing demands on their operational performance. These datasets can be difficult to visualize and may contain complex relationships that are challenging to understand. Additionally, as the demand on accelerator operations increases so does the need for automated tuning algorithms and control to maximize uptime with reduced operator intervention. Existing tools are insufficient to meet the broad demands on controls, visualization, and analysis. The approach is to develop a web-based toolkit with access to advanced control and data analytics libraries in addition to particle accelerator simulations. This toolbox will be able to connect to the control system for data collection and deployment of control algorithms. The toolkit will be equipped with community supported tracking codes, thereby enabling users to simulate machine dynamics and develop reduced models for low level control systems and machine drift. During Phase I, a prototype graphical web interface was developed for data analysis, using open source software libraries. Connections between this web interface and a widely used open source control system software have been developed. The use of our web interface was successfully demonstrated on simple tuning tasks. Improved modeling capabilities were developed and demonstrated for the transfer line from an alternating gradient synchrotron to a relativistic heavy ion collider at a prominent national laboratory. Using an open source software middle layer, advanced control algorithms were tested and verified for the reconfiguration of this beam line. During Phase II, the capabilities prototyped in Phase I will be expanded by creating a toolbox that can be easily customized and deployed at many facilities. Users will be able to rapidly build web-based control interfaces for data analysis, automated tuning, and advanced fault detection. Our software will be tested at the two national laboratories, which are involved in design of the proposed electron ion collider. The proposed web-based toolkit will directly benefit domestic research laboratories, and will be relevant to many commercial applications, such as medical accelerators, waste treatment, small university-based accelerators, and virtually any large-scale industrial control system.

Timeline

No Timeline data yet.

Further Resources

Title
Author
Link
Type
Date
No Further Resources data yet.

References

Find more entities like RadiaSoft LLC SBIR Phase II Award, April 2020

Use the Golden Query Tool to find similar entities by any field in the Knowledge Graph, including industry, location, and more.
Open Query Tool
Access by API
Golden Query Tool
Golden logo

Company

  • Home
  • Press & Media
  • Blog
  • Careers
  • WE'RE HIRING

Products

  • Knowledge Graph
  • Query Tool
  • Data Requests
  • Knowledge Storage
  • API
  • Pricing
  • Enterprise
  • ChatGPT Plugin

Legal

  • Terms of Service
  • Enterprise Terms of Service
  • Privacy Policy

Help

  • Help center
  • API Documentation
  • Contact Us
By using this site, you agree to our Terms of Service.